Welcome to our online store!
You have no items in your basket.
Close
Filters
Search

FIDIC Quick Reference Guide: Silver Book

Author/EditorBarr, Brian (Author)
Grutters, Leo (Author)
ISBN: 9780727760388
Pub Date03/12/2014
BindingPaperback
Pages134
Dimensions (mm)297(h) * 210(w)
The FIDIC Quick Reference Guide: Silver Book provides commentary on the FIDIC Silver Book: FIDIC Conditions of Contract For EPC/Turnkey Projects.The book is a valuable tool for practitioners who are either preparing or using the contract form.
£42.00
excluding shipping
Availability: Available to order but dispatch within 7-10 days
+ -

The FIDIC (Federation Internationale des Ingenieurs-Conseils) forms of contract are used extensively throughout the world to further the aims of the construction industry at large. In both the developed and the developing world they play a crucial role in ensuring that project objectives are satisfactorily achieved.


The FIDIC Quick Reference Guide: Silver Book provides commentary on the FIDIC Silver Book: FIDIC Conditions of Contract For EPC/Turnkey Projects, which is suitable for a process or power plant, a factory or similar facility, or an infrastructure project or other type of development, if a higher degree of certainty of final price and time is required and the Contractor takes total responsibility for the design and execution of the project. The book is a valuable tool for practitioners who are either preparing or using the contract form, as it directs the user through the various cross-referenced sub-clauses.


Rather than solving a problem after the conflict has occurred, the FIDIC Quick Reference Guide series of books and associated electronic aids set out how to prevent the problem from occurring in the first place.


The FIDIC Quick Reference Guide series




Concentrates on two issues: what to do and when to act
Establishes a simple sub-clause by sub-clause format to enable easy referencing
Is designed to be used alongside the project's contract form
Provides a quick overview of the actions to be taken and the time in which to take such actions

The FIDIC (Federation Internationale des Ingenieurs-Conseils) forms of contract are used extensively throughout the world to further the aims of the construction industry at large. In both the developed and the developing world they play a crucial role in ensuring that project objectives are satisfactorily achieved.


The FIDIC Quick Reference Guide: Silver Book provides commentary on the FIDIC Silver Book: FIDIC Conditions of Contract For EPC/Turnkey Projects, which is suitable for a process or power plant, a factory or similar facility, or an infrastructure project or other type of development, if a higher degree of certainty of final price and time is required and the Contractor takes total responsibility for the design and execution of the project. The book is a valuable tool for practitioners who are either preparing or using the contract form, as it directs the user through the various cross-referenced sub-clauses.


Rather than solving a problem after the conflict has occurred, the FIDIC Quick Reference Guide series of books and associated electronic aids set out how to prevent the problem from occurring in the first place.


The FIDIC Quick Reference Guide series




Concentrates on two issues: what to do and when to act
Establishes a simple sub-clause by sub-clause format to enable easy referencing
Is designed to be used alongside the project's contract form
Provides a quick overview of the actions to be taken and the time in which to take such actions

The FIDIC Handbook Series will form a series of low cost guides to all FIDIC Contract administrators. They will ensure that appropriate timely actions are taken during the course of a construction contract in order to improve communication, stimulate better administration and highlight accountability at an early stage, thereby improving the working relationships between the parties and reducing the potential for disputes. The guidelines suggest actions for each party to take, stipulate the time to take such action, provide relevant comments and includes model letters where appropriate for each Sub-Clause within the Contract. This book, FIDIC Handbook - Silver, provides commentary on the Silver Book: FIDIC Conditions of Contract For EPC/Turnkey Projects, which is suitable for a process or power plant, a factory or similar facility, or an infrastructure project, or other type of development, if a higher degree of certainty of final price and time is required and the Contractor takes total responsibility for the design and execution of the project.

Write your own review
  • Only registered users can write reviews
*
*
Bad
Excellent
*
*
*
Customers who bought this item also bought
Close
)
CLOSE